Energy & Waste

The challenge in Energy and Waste facilities is to design and coordinate a fire protection system in a congested and vast area filled with mechanical and electrical services. Also, some of these structures are extremely high to reach, which offers its own challenges. Today’s modern method is to design it by way of 3D Modeling (BIM). This allows all the services to be viewed and coordinated with all the other trades beforehand, thus allowing a seamless installation without conflict and giving the end user exact locations of critical devices all from the touch of a computer keyboard.
  • Trans Canada Pipelines – Fuel Storage & Pumping Facility, Farrans Point
  • Waste to Energy Facility, Courtice, Ontario
  • Duffin Creek WPCP, Pickering
  • Highland Creek WPCP, Scarborough
  • Lorne Park WTP, Port Credit.